We have carried out a number of refurbishments and upgrades including:
- Rewinding with modernisation of the exciter, type WGT – 2700 – 500; 1150kVA.
- Overhaul of stator and rotor of the H-1 hydro-generator; type GS237; power 4400MVA; 6 kV
- Overhaul of stator and rotor of a SAS 1812 type engine; power 2750 kW; 6 kV
- Re-winding of the stator of the 930MK1C compressor motor, type CT10Y16; power 3700 kW; 10 kV
- Overhaul of motor stator, type 1-MC-02; power 4400kW; 6 kV
- Overhaul of transformer, type TAO 8000/15; power 8000kVA; 15/6 kV.
- Overhaul of electromagnetic drum, type MDM120/200 10700W
- Rewinding of a dry autotransformer, type TLHO 24/9103; 6810 kVA.
- Rewinding of a dry autotransformer, type TLHO 24/9103; 6810 kVA.
Among other things, we have supplied traction switchgear for construction and modernisation projects carried out on the following railway lines:
- 14, 811 on the following section: Łódź Kaliska – Zduńska Wola – Ostrów Wielkopolski,
- E59 on the section between Dobiegniew and Słonice,
- E20 on the section between Warszawa and Poznań,
- 99 CHABÓWKA – ZAKOPANE,
- C-E 65 on the following section: Chorzów Batory -Tarnowskie Góry – Karsznice – Inowrocław – Bydgoszcz – Maksymilianowo.
The most important completed projects in this field of activity of ZPRE “Jedlicze” Sp. z o. o. include:
- Delivery of steel structures for apparatus and structures for substation gates in relation to reconstruction and construction of 400kV switching stations in Kozienice, Żydów, Gdańsk, Olsztyn and Bydgoszcz.
- Delivery of lighting towers in connection with the implementation of the task entitled “The modernisation of the sports stadium at Legionów Street in Krosno – the construction of lighting for the pitch, the track and the machinery park, together with the necessary technical infrastructure”.
- Fabrication of steel structures for observation towers in the following localities: Świeradów Zdrój, Różanka, and steel observation towers in: Skryhiczyn, Uchańska and Ichniszów.
- The prefabrication of the guide shaft structure with anti-corrosion and fire protection in the L-6 shaft construction area as part of the investment entitled “Construction of a shaft complex including transport logistics as part of the project – Changing the function of the L-6 shaft to a material and descent shaft”.
- Construction of steel structures as part of the project entitled “Design, construction, equipping of a DVOR/DME radio navigation facility with the necessary technical infrastructure”.
- Delivery of construction of 22 osprey nesting platforms on high voltage towers in the forest districts of north-western Poland.
- Delivery and assembly of steel constructions for the communication link as part of the investment task “Modernisation of Pyrometallurgy in the PZ extraction section in HMG I”.
- Construction of exhaust gas ducts with supports as part of the modernisation of the Kortowo Combined Heat and Power Plant.
- Delivery of 400 kV tower structures in connection with the construction of a 400 kV line connecting the following locations: Kozienice – Siedlce, Bydgoszcz Zachód – Jasiniec, Warsaw metropolitan area – Siedlce, Ełk Bis – state border.
- Delivery and installation of 400 kV towers structures in connection with the extension and modernisation of the 220/110 kV Skawina line along with the introduction of a 2x2x400 kV line.
- Fabrication of prototype 220 kV towers together with strength tests in connection with the construction of the 220 kV Recław – Glinki line.
Among other things, we have carried out the following within this field of economic activity:
- Delivery and installation of dedusting, desulphurisation and denitrification systems at the MPEC Olsztyn – Kortowo heat plant – total of approx. 700 tonnes.
- Fabrication, delivery and assembly of steel constructions for the furnace platform along with anticorrosive protection as part of the task entitled “Development of a continuous laminate production technology for a wide range of thermoplastics with a special focus on inorganic fibres in particular continuous basalt fibre”.
- Erection of a manufacturing hall in Krosno for Goodrich Aerospace Poland Sp. z o. o.
- Construction of a storage facility with internal installations in Miejsce Piastowe – 451 m2 for M-Bud Warszawa Sp. z o. o.
- Construction of a detached service building – indoor tennis court with sanitary facilities in EPC mode in Krosno – 784 m2 for WAYSS FREYTAG Sp. z o. o.
- Construction of a production hall for manufacturing steel structures in Jedlicze – 2726 m2 for Budomex Sp. z o. o.
- Construction of a hall with installations/systems in Jasienica Rosielna – 874 m2 for Multi Stone Sp. z o. o.
- Extension of a production building – finishing hall for processing boards with a transformer station in Krosno – 1862 m2 for Panmar Sp. J.
- Construction of an innovative production and service centre, including the construction of a production and warehouse building together with a staff recreation and office building in Szczepańcowa – 1794 m2 (Factory 4×4).
- Construction of an innovative raw materials base with proprietary technological solutions – as a result of the work, 11 shelters were built for the storage and warehousing of materials with a total built-up area of 5,741.22 m2 for Panmar Wood Sp. z o. o.
- Construction of a storage and logistics hall with a loading shed on the premises of the PANMAR facility in Krosno – 3975 m2 for Panmar Sp. J.
- Construction of a production and storage hall in Krosno – 1820 m2 for Laminex.
The measurement laboratories produced by ZPRE “Jedlicze” Sp. z o.o. function, among others, in such locations as:
- TAURON Dystrybucja S.A.
- PGE Dystrybucja S.A.
- PKP ENERGETYKA S.A.